Entreprise internationale de premier plan - Avis employé Translator Archirodon

4,0
27 juin 2019
Recommande
Approbation du PDG
Perspective commerciale

Avantages

Normes européennes - administration bienveillante

Inconvénients

Méthode hyper classique - rythme ralenti

Découvrez plus d’avis sur Archirodon

4,0
4 avr. 2021
Recommande
Approbation du PDG
Perspective commerciale

Avantages

Good salary comparing to the market High level of stability

Inconvénients

No KPIs Promotion based on number of spent years not on progress achieved

1
5,0
7 avr. 2026
Recommande
Approbation du PDG
Perspective commerciale

Avantages

• Mechanical Engineer having 36 Years of Experience in fields of Executing to Tender. Bidding, Engineering, Procurement, Construction,Workover Engineering, hook up, hydro test. Commission of Cross country (Oil & Gas) pipelines, Flow lines, Refinery & Petrochemicals Expansion, Chemical process Plant, Rig Plot, Xmas-Tree. well head, Water well injection, Oil tanking terminal facility, MEP Project, Captive and Cogeneration power Plant. Processing and hydrocarbon handling facilities with exposure to long-distance pipeline and booster station systems. • International Projects of Oil &Gas processing, Water & Waste water Treatment, ITR control , Blast rates &specialized Building, Jacksers,top side, Anchor piles ,offshore Bridges, Skids,. package, modular solution, Automation control (PLC,SCADA,DCS), Remote control stations,SIS (F&G,ESD,SIS,HIPPS). • Budgeting, cost control, & variance analysis, Drive cost optimization & efficiency Variations,changeorders&claimsmanagement.QSPipelineprojects(MRICS/AIQS)Risk,Stakeholder,CommunicationManagementPlan,Review, monitor project baseline schedules, claims, variations • Pumps, Valves. Air compressor, HVAC works includs ducting, chilled water piping, and equipment installation. plumbing, drainage, water supply system installations..BIM, FM200System, NFPA14Fire Hydrant System • API 620 tank, API 650 Editions 12, 2013 , Cone Roof Tank, 60Meter,Dome Roof Tank, Internal Floating Roof, Floating roof tank,ASME SEC. 8, DIV1 ,Carbon Steel Storage Tank for JET A1 Fuel Storage. Crude oil, Gasoline , components

Inconvénients

No Concern • Project Planning, Scheduling, Cost control, Man-hour control, Resource cost and utilization • Risk Analysis & Mitigation Plan, Root Cause analysis, identify and Execute the Corrective Action • Managing MRs, vendor offer reviews, TQs/ TBE, PO award, spares management • Ensure quality checks and Progress tracking of design activities performed in the 3D environment