I had two back-to-back about 30 min interviews with different employees from Eaton. It was conducted online due to covid. Both were engineers, and I was able to ask questions related to their work.
J'ai postulé en ligne. Le processus a pris 2 semaines. J'ai passé un entretien chez Eaton (Waukesha, WI) en mai 2021
Entretien
I had a phone screen with the hiring manager. After this I had an in person scheduled. The first part was with HR, then I met with the hiring manager and two engineers.
Questions d'entretien [1]
Question 1
How can you improve the overall efficiency of low volume work?